Product Group

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Get a Quote

Our representative will contact you within 24 hours.

Powder Coating (PC)

PC cable bracket Process Overview: Electrostatic application of dry powder particles followed by thermal curing to form a protective and decorative finish over pre-treated steel surfaces.

PC cable bridge Process Flow:

1. Surface Preparation: Chemical pre-treatment (phosphating or chromating)

2. Powder Application: Electrostatic spray application

3. Curing Process: Thermal curing at 180-200°C for 15-20 minutes

4. Quality Control: Film thickness and adhesion testing

5. Final Inspection: Visual and performance verification

PC cable tray Advantages:

· Aesthetic Versatility: Wide range of colors, textures, and finishes

 · Environmental Friendly: No volatile organic compounds (VOCs)

 · Excellent Durability: Superior resistance to chipping, scratching, and fading

 · Chemical Resistance: Good resistance to solvents and chemicals

 · Uniform Coverage: Consistent film thickness and appearance

· Economic Efficiency: High transfer efficiency with minimal waste

PC cable bracket Disadvantages:

· Substrate Preparation Critical: Requires high-quality pre-treatment

· Temperature Limitations: May soften at temperatures above 80°C

 · Repair Complexity: Damaged areas require complete recoating

 · Cathodic Protection: No sacrificial protection at damaged areas

 · Thickness Limitations: Difficult to achieve very thick coatings

PC cable bridge Applications & Service Life:

· Architectural and decorative installations: 15-25 years

 · Indoor environments with aesthetic requirements : 20-30 years

· Data centers and clean rooms: 15-25 years

 · Commercial buildings and shopping centers: 18-28 years

 · Color-coded cable management systems: 15-20 years

 · Food processing facilities (interior): 12-20 years

 · Educational institutions: 20-30 years

 · Healthcare facilities: 15-25 years

PRODUCT DESCRIPTION

Product type Ladder Cable Tray/Channel Cable Tray/Perforated Cable Tray
Material Hot-dip galvanized /stainless steel fireproof spray 7aluminum alloy
Surface Treatment Pre-Gal/Electro-Gal/Hot dipped galvanized/Powder coated/Polishing
Size Width 50-1200mm
Side rail height 25-300mm
Length 2000mm,3000-6000mm or Customization
Thickness 0.6-3mm
Steel Thickness
(Recommend)
1.00mm-50*25mm,75*75mm
1.2mm-100*50mm,150*100mm
1.5mm-200*100mm,300*150mm,400*150mm,500*150mm
2.0mm-600*200mm,700*200mm
2.5mm-800*200mm
As customer requirements
Color As customer requirements
Certification ISO9001/CCC/CE/UL/CUL
Used Wiring system,cable management,hoisting system,construction industry and so on
Loading Test Our wire mesh cable tray meet the standards requirements of IEC61537 and NEMA VE-1
Non standard specifications are available according to customers’ requirement

ABOUT US

Shandong Hongfeng Electric Group Co., Ltd. was established in 2006. It is a first-class cable tray manufacturer in China, integrating R&D, production and sales. It has 20 years of production experience. With stable quality and efficient production capacity, our factory provides partners with one-stop ODM and OEM services to meet their customized needs for cable tray related products and provide reasonable one-stop solutions for cable tray systems.

 

If you are looking for a reliable supplier and long-term partner, Hongfeng is your best choice. We have pioneered the production of cable tray automation technology, which is far ahead of traditional manual manufacturing. We use advanced technology to solve your product problems. We are proud to have maintained a leading position in the industry for 20 years, and at the same time we escort our customers to obtain the quality and success they pursue in a highly competitive environment.

THE FACTORY PRODUCTION

THE PACKING

HONORARY CERTIFICATE

SCOPE OF APPLICATION

OUR CUSTOMER

GOOD COMMENTS

Related products

Contact Us

Fill out the form below, and we will be in touch shortly.

Get A Quqte